Skip to content

Physical therapy

DEMO-16Obligation Superseded: PT Referral Replaced by Surgical Decision

Authored demonstration. Not a live employer result.

01 · Situation

A physical therapy referral is never completed because a later surgical decision changes the treatment plan entirely.

Illustrative treatment-planning protocol, empowering the attending surgeon to supersede a standing referral when a documented change in treatment plan makes it moot.

02 · Evidence

What the record holds.

  1. E1Original PT referral, Day 0

    Verified · Day 0

  2. E2Surgical decision note, Day 20, explicitly stating the PT referral is superseded by the new surgical plan, signed by the attending surgeon acting under the authority named in the treatment-planning protocol

    Verified · Day 20

03 · Obligations / Owners

The chain of responsibility.

  1. 01

    PT provider (original referral, Day 0–20) — superseded by the attending surgeon's documented authority, per the protocol, effective Day 20.

04 · Event Type

The classification of the event.

EvidenceAttached (E1, the original obligation); EvidenceAttached (E2, the superseding decision); VerificationCompleted, evaluating the supersession against the authority named in the protocol.

05 · Verification Result

What verification established.

SUPPORTED — evidence supports supersession by an identified, protocol-empowered authority.

06 · Projection

What the evidence implies ahead.

Superseded, effective Day 20.

07 · Next Action

The corrective obligation.

None — this is the intended disposition, not a break requiring correction.

08 · Economic Boundary

Where the evidence stops.

Not applicable.

09 · Engine Answer

What the Engine can and cannot establish.

The PT referral in E1 was a valid obligation as of Day 0. On Day 20, the attending surgeon — acting under the authority the treatment-planning protocol assigns for exactly this purpose — explicitly documented that the referral was superseded by a new surgical plan. The Engine preserves both facts: the original obligation existed, and it was superseded by a later, identified, authorized decision. Its final disposition is neither fulfillment nor failure nor cancellation; the obligation was superseded effective Day 20.

Not fulfilled. Not failed. Not cancelled. Superseded, effective Day 20.

10 · What Remains Unknown

Outside the Engine's reach.

Nothing material to the supersession itself; whether the new surgical plan generated its own new obligations is outside this record's scope.